The Dredge “Texas” is currently docked in New York receiving predictive and preventative maintenance. Filling of the displaced sand was then to start in Avalon in early April, working from north to south, eventually reaching Stone Harbor toward to the end of April.Īs of April 1st, delays in the start of the dredging have been encountered and GLDD is currently projecting to start beach fill operations in Avalon by April 12 to 14. The original plan outlined during the January 25th Pre-Construction Meeting, proposed the dredging of the borrow site in Townsend’s Inlet to have commenced in March. Nondiscrimination in Programs Receiving Federal Assistance from the U.S.Update on Great Lakes Dredge and Dock’s (GLDD) Beach Nourishment project for Seven Mile Island. No discriminación en los Programas del EGLE Política sobre la Participación Pública en las Decisiones del DepartamentoĮvaluating Mercury in Groundwater Plumes Relative to the Groundwater/Surface Water Interface (GSI) Pursuant to Part 201 Policy on Public Involvement in Department Programs and Activities Supplemental Environmental Projects for Penalty Mitigation Waivers Affecting Fee Assessment Closures Affecting Fee Applicabilityĭisclosure of Public Records: Responding to Freedom of Information Act Requests Permit Exemption for Changes in a Process or Process Equipment that are not a Meaningful Change or Meaningful Increase in Toxic Air ContaminantsĪsbestos NESHAP Program Standard Operating ProceduresĪir Quality Division Incident Management PolicyĮstablishing Emission Limits in Accordance with Rule 225 Replacement of Engines, Compressors, or Turbines as Part of a Normal Maintenance Program at Landfill Gas-To-Energy Facilities Issue Resolution Process for Permit to Install ApplicationsĪpplication of Rule 901(b) in the Permit to Install Review Processĭispersion Modeling Guidance for Federally Regulated Pollutants Procedure for Processing Permit to Install Applications Subject to Federal Clean Air Act Section 112(g) Use of Visible Emissions Limits Less than 20% Opacity in Permit to Install Procedures for Handling of Confidential Materials and Freedom of Information Requests for Confidential MaterialsĬriteria Pollutant Threshold Levels for the Point Source Emissions Inventory Procedure for Implementation of the Renewable Operating Permit Program Application Shield Mechanisms for Limiting the Applicability of Michigan's Renewable Operating Permit Program
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |